CORDEK LTD

SPRING COPSE BUSINESS PARK
SLINFOLD
WEST SUSSEX RH13 0SZ

Tel: 01403 799600
Fax: 01403 791718

Company Logo

Suppliers of: Cellcore, Cellform, Cellvent, Heaveguard, Ventform, Puraflex, Correx, Filcor, Groundform, Corgrid, Groundform, Sideform, Pilecor, Corbreak, Formers, Trough Moulds, Waffle Moulds

Cordek provides technical solutions for a range of construction requirements. Innovative thinking, engineering expertise, and CAD/CAM capabilities enable Cordek to solve a wide variety of engineering problems. Since their formation in 1973, Cordek have worked on major iconic projects through to domestic extensions, and remain committed to supplying the best quality, value solutions, supported by the highest levels of personal service.

Cordek have a range of CAD drawings and BIM Files: click here

Cordek Construction Products

Cordek can now offer an exciting range of products that are extensively used in a variety of construction applications.

The Cordek product range is listed below by market sectors:

Ground Heave Solutions

Products for the protection of buildings from the effects of expansive soil.

VOC & Ground Gas Protection

A range of solutions for the protection of buildings from the hazards relating to VOC’s and ground gas.

Structural Fill Solutions

Expanded Polystyrene for use as a lightweight alternative to traditional fill materials, for permanent load bearing applications.

Void Formers

Used for the formation, shaping and positioning of openings to reduce the weight of concrete structures.

Standard Formwork Solutions

Falsework and Formwork systems to aid the construction of structures formed from both masonry and reinforced concrete

Permanent Formwork for Ground Beams & Pile Caps

Economical permanent formwork systems that have replaced traditional formwork materials for the construction of cast in-situ concrete foundations.

Formwork for Ribbed Concrete Floors

Established formwork systems for the construction of both one way (troughs) and two way (waffles) spanning ribbed concrete floors.

Piling Products

Solutions to common issues associated with piled foundations.

Temporary Access & Protection

Access/ protection solutions for construction and refurbishment works.

Cordek offers additional services for design and construction of bespoke formwork and patterns & moulds, as well as a range of Comprehensive Continuing Professional Development (CPD) Seminars for Architects, Contractors, Designers, Engineers and Specifiers. Our technical experts are happy to visit you at your convenience to hold a CPD session.

The CPD Seminars available include:

  • Bespoke Formwork
  • Cordek Solutions
  • Lightweight Structural Fill & Void Forming
  • VOC & Ground Gas Protection

For more information please visit www.cordek.com or email contact@cordek.com

Further technical information including; Data Sheets, Standard Details and Certifications of Approval is available from Cordek’s Technical Library here

 

 

ACCESS RAMPS Disabled Access Ramps .See Also MOBILITY RAMPS:
ACCESS RAMPS Portable
ACCESS RAMPS Temporary
AIR BRICKS Ground Gas Ventilation
BOARDS Antistatic
BOARDS Crush Resistant
BOARDS Flame Retardant Boards
BOARDS Polypropylene
BOARDS Protection For Waterproofing Membranes
BOLLARDS Ground Gas Venting
BUILDING PROTECTION Temporary Correx
CAVITY TRAYS Gas Barrier
COLUMN FORMERS
DAMPCOURSES Gas Resistant
DAMPCOURSES Hydrocarbon Barrier
DAMPCOURSES Methane Barrier
DEBRIS CONTROL
EXPANDED Polystyrene EN 13163:2001
EXPANDED Polystyrene Loadbearing
FABRICATIONS EPS Loadbearing
FABRICATIONS EPS Expanded Polystyrene
FLOOR Protection Temporary Correx
FLOORS Concrete In-Situ Specialist Moulds
FLOORS Concrete In-Situ Trough Moulds
FLOORS Concrete In-Situ Waffle Moulds
FORMERS Expanded Polystyrene
FORMERS Purpose Made
FORMERS Staircase
FORMWORK Accessories
FORMWORK Concrete
FORMWORK Curved
FORMWORK Dished Floor
FORMWORK Elements
FORMWORK Insulating
FORMWORK Insulating ICF Systems
FORMWORK Moulds
FORMWORK Moulds Architectural
FORMWORK Moulds Archway
FORMWORK Moulds Bridge Parapets
FORMWORK Moulds Columns
FORMWORK Moulds Contoured Roofing Roofs
FORMWORK Moulds Diving Boards
FORMWORK Moulds EPS
FORMWORK Moulds Floor
FORMWORK Moulds Glassfibre Fibreglass Moulds
FORMWORK Moulds Helical Staircases
FORMWORK Moulds Internal
FORMWORK Moulds Light Recesses
FORMWORK Moulds Marine Applications
FORMWORK Moulds Polypropylene
FORMWORK Moulds Purpose Made Bespoke
FORMWORK Moulds Railway
FORMWORK Moulds Re-Usable
FORMWORK Moulds Spiral Staircases
FORMWORK Moulds Trough and Waffle
FORMWORK Moulds Vaulted Ceilings
FORMWORK Permanent
FORMWORK Permanent Ground Beams
FORMWORK Permanent Ground Heave Protection
FORMWORK Permanent Ground Movement Protection
FORMWORK Permanent Pile Caps
FORMWORK Sloped Floor
FORMWORK Specialist
FORMWORK Systems
FOUNDATION Clayheave Protection
FOUNDATION Clayheave Protection AGREMENT CERTIFICATE HOLDERS
FOUNDATION Engineering
FOUNDATION Gas Passive Venting Systems
FOUNDATION Ground Heave Protection Boards / Sheets
FOUNDATION Ground Heave Protection Boards / Sheets AGREMENT CERTIFICATE HOLDERS
FOUNDATION Ground Heave Protection Boards / Sheets Expanded Polystyrene EPS
FOUNDATION Ground Heave Protection Boards / Sheets NHBC Technical Standards
FOUNDATION Ground Heave Protection Boards / Sheets Pile Collars
FOUNDATION Ground Heave Protection Panels
FOUNDATION Ground Heave Protection Panels AGREMENT CERTIFICATE HOLDERS
FOUNDATION Ground Heave Protection Panels Gas Venting
FOUNDATION Ground Heave Protection Panels NHBC Technical Standards
FOUNDATION Ground Heave Protection Panels Thermal Insulation Combined
FOUNDATION Ground Movement Protection
FOUNDATION Ground Movement Protection AGREMENT CERTIFICATE HOLDERS
FOUNDATION Systems Shallow Depth Minimal Dig Insulating Expanded Polystyrene Pods EPS
GROUND BEAM Formwork
GROUND GAS Protection Panels Methane Barriers Ground Soil Level
GROUND GAS Protection Systems
GROUND GAS Sumps
GROUND GAS Venting Systems
GROUND GAS Venting Systems Passive Gas Venting Media
GROUND MOVEMENT Protection
IN-SITU CONCRETE Moulds
INSULATING CONCRETE FORMWORK (ICF SYSTEMS)
INSULATING CONCRETE FORMWORK (ICF SYSTEMS) Above Ground Wall
INSULATING CONCRETE FORMWORK (ICF SYSTEMS) Acoustic Wall
INSULATING CONCRETE FORMWORK (ICF SYSTEMS) Basement Wall
INSULATING CONCRETE FORMWORK (ICF SYSTEMS) Curved Wall
INSULATING CONCRETE FORMWORK (ICF SYSTEMS) Earth Sheltered Wall
INSULATING CONCRETE FORMWORK (ICF SYSTEMS) Swimming Pool Construction
INSULATING CONCRETE FORMWORK (ICF SYSTEMS) Zero Energy Buildings
JOINT SEALING STRIPS .
LANDFILL Engineering
LANDFILL Lining Barriers
LANDFILL Site Construction
LANDSCAPING Structures
LANDSCAPING Structures EPS Purpose Made
LIFT SHAFT Construction Shuttering
MEMBRANES Acid Resistant EN 14030
MEMBRANES Alkali Resistant EN 14030
MEMBRANES Chemical Resistant
MEMBRANES Chemical Resistant EN 14414
MEMBRANES Chemical Resistant EN 14415
MEMBRANES Damp Proofing DPM
MEMBRANES Gas Barrier
MEMBRANES Gas Barrier BS 8485:2015
MEMBRANES Gas Impervious
MEMBRANES Gas Retardant
MEMBRANES Gas Retardant Self-Adhesive
MEMBRANES Methane Gas Retardant
MEMBRANES Radon Barrier
MEMBRANES Radon Resistant
MEMBRANES Self Adhesive
MOBILITY RAMPS Lightweight Portable
PARK LANDSCAPING STRUCTURES .See Also LANDSCAPING: Structures
PERMANENT Shuttering
PILE Cap Formwork
PILE Locators
PILING Accessories
PILING Infill Sheet piling
POLYTHENE Sheeting
POLYTHENE Sheeting Temporary
POOLS Ornamental EPS Construction
POOLS Purpose Made EPS Construction
PRIMERS: TYPES Bitumen
PROTECTIVE Materials
PROTECTIVE Materials Temporary
PROTECTIVE Sheeting Temporary
RADON Barriers
RADON Protection Systems
RADON Sumps
RAFTS Floating EPS
RAILWAY PLATFORMS Temporary
RAILWAY SHUTTERING
RAILWAY TEMPLATE MOULDS
SHUTTERING Bridge Parapets
SHUTTERING Columns
SHUTTERING Elements
SHUTTERING Elements Balcony
SHUTTERING Lining
SHUTTERING Permanent
SHUTTERING Purpose Made Bespoke
SHUTTERING Re-Usable
SHUTTERING Sacrificial
SHUTTERING Specialist
SHUTTERING Spiral Staircases
SHUTTERING Stop Ends
SPACERS Polypropylene
STAIR FORMERS
STATION PLATFORMS Temporary
STRUCTURAL WATERPROOFING Systems
TANKING Systems
TANKING Systems Waterproofing Membranes
TEMPLATES Arch Formers
TEMPLATES Archway
TEMPLATES Column construction
TEMPLATES Dished Floor
TEMPLATES Purpose Made
TEMPLATES Sloped Floor
TEMPLATES Special Moulds
TEMPLATES Staircase Construction
TEMPLATES Temporary
THRUST BOXES
TROUGH Moulds
TROUGH Moulds EPS
TROUGH Moulds Polypropylene
TROUGH Moulds Purpose Made
VENTILATION Cavity Wall (Natural)
VENTING SYSTEMS Gas/Oil
VOID FORMERS
VOID FORMERS EPS
VOID FORMERS Purpose Made
WAFFLE MOULDS Polypropelene
WALKWAYS Temporary
WALL COVERINGS PVC-u Sheet Temporary Protection
WALL PROTECTION Temporary Correx
WINDOW FORMERS EPS Purpose Made
CELLCORE Foundation
CELLCORE HG Ground Heave Protection Panels
CELLCORE HX Ground Heave Protection Panels
CELLCORE HX Hexagonal Ground Movement Protection
CELLCORE PLUS Insulating Ground Heave Protection Panels
CELLFORM Permanent Formwork
CELLFORM HX Formwork with Ground Movement Protection
CELLVENT Gas Venting
CELLVENT HX Gas Venting Ground Heave Protection Panels
CORBREAK Pilehead Trimming
CORGRID Permanent Formwork Systems
CORREX Polypropylene Sheet
FILCOR Expanded Polystyrene
GROUNDFORM Permanent Formwork
HEAVEGUARD Ground Heave Protection Boards / Sheets
HEAVEGUARD Pile Collars
M MOULD Waffle Moulds
PILECOR Piling Accessories
POWERBASE Gas Membranes
PURAFLEX Gas Membranes
SEEKURE Temporary Protection Sheets
T FORM Trough Moulds
TIPFORM Landfill Engineering
TRI-GAS MEMBRANE Gas Membranes
TRIC TRAC Linear Building Spacers
VENTFORM Gas Venting

Cordek Rubber Formwork Liner - Great Eastern Quays

November 2021

The historic London Royal Docks have been undergoing a three-phase regeneration which includes the formation of new residential, commercial and leisure areas. The Great Eastern Quays scheme is part of this regeneration project,and during the construction, Cordek was brought on board to provide a formwork solution for feature balconies on one of the new apartment developments.

Cordek were approached by the concrete frame contractor Modebest to provide a formwork solution for creating a ‘scalloped’ profile to the underside of the cast in-situ concrete balconies. The proposal was to provide rubber formwork liners supported by a plywood deck/props for multiple re-use.

The solution comprised of supplying formwork liners manufactured from Reckli 45 poured in liquid form in to model board moulds, machined using a 5-axis router. Once cured, the formwork liners were demoulded and supplied to site in three units, two of them standard (re-used multiple times) and one bespoke to suit the required shape and dimensions of the individual balcony type. Joints in the formwork liner were hidden so that the specified smooth, blemish free finish was achieved in the exposed concrete. In total there were approximately 300no. balconies with a maximum size of 7.1m x 1.8m.

Cordek Supplied Filcor 100 - M4 Junction 3-12 Motorway Upgrade

October 2021

The M4 Junction 3-12 motorway upgrade project, which started construction in July 2018, is designed to increase capacity, and reduce congestion between Junction 3 (Hayes) and Junction 12 (Theale). In the sections where there is no pre-existing hard shoulder for conversion into an additional running lane, a total of 11 overbridges needed to be demolished and replaced with longer decks to enable continuity of the widened carriageway.

The £848m project is due for completion in Spring 2022, by which time it is expected that approximately 680,000t of material will have been excavated, 1.8M.m² of new surface laid, 130km of cabling installed and 63km of concrete barrier positioned.

Cordek were approached by the Principal Contractor Balfour Beatty VINCI joint venture to provide a lightweight structural fill solution to be used for the embankment construction adjoining the Datchet Road Overbridge, between Junction 5 and Junction 6.

Project Scope

It was identified that beneath the proposed location for the Datchet Road Overbridge embankment, lay a localised area of peat deposits which provided concerns over potential settlement and subsequent impact on the carriageway adjoining the bridge. Additionally, underlying HV cables and the requirement to reduce the influence from the embankment construction above, led the project designers to conclude that a lightweight structural fill solution was required.

The Solution

Due to the ongoing COVID-19 pandemic at the time, all discussions between Cordek and Balfour Beatty VINCI were undertaken remotely and therefore relied upon the use of digitally shared design information to determine the project requirements.

The use of 3D BIM modelling techniques indicated that from formation level to the deepest point of the lightweight structural fill was approximately 5.0 metres, which terminated around 1.2 metres beneath the surface of the proposed carriageway. Further scrutiny of the 3D model suggested that a total volume of 4,070 m³ of material would be required, in the form of Filcor 100 Expanded Polystyrene (EPS) blocks.

The project designers determined that Filcor 100 provided the optimum combination of lightweight properties at only 35kg/m³, with a compressive strength capable of withstanding the loadings attributable to the embankment construction with minimal deflection. Furthermore, the use of Filcor 100 within the embankment removed the requirement for compaction or earth moving plant, allowing the ambitious programme for installation to be met.

Each Filcor 100 block was supplied with the dimensions 2400mm x 1200mm x 600mm and installed in staggered layers to aid stability whilst exposed. Where cutting of the blocks was required, this was undertaken using Cordek’s 110v portable Hot Wire Cutters that were provided to Balfour Beatty VINCI on a hire and return basis.

Summary

Despite the COVID-19 restrictions in place at the time and the relatively short lead-in to the project, Cordek supplied the 4,070 m³ of Filcor 100 required by the means of 59 fully loaded articulated lorries in just over five weeks, meeting the contractor’s construction programme without delay.

Whilst this element of the project was undertaken in the Autumn of 2020, Balfour Beatty VINCI is expected to complete the whole M4 motorway upgrade scheme on behalf of their client Highways England, during spring 2022.

List all press releases